Tel:(+86) 516-85870709
Fax:(+86) 516-83967868
Phone:(+86)13852483938
E-mail:hhssgroup@163.com
Add:NO.1,Minjiang Road ,Industrial Park, Hi-Tech Industrial Development Zone,Xuzhou,Jiangsu Province,P.R,China
3: steel structure building the pile foundation, pile end down into the liquefaction depth below the length of the stability in the soil, according to the bearing capacity of the pile should be calculated and determined, and shall not be less than the following values, excavating tall building foundation within the scope of the three all can liquefaction soil layer.
【Previous Item】:没有啦
【Next Item】:Notes for the construction of steel structure or space frame
Home | Recent Works | Products | Join Us | Contact Us
All copyrights reserved 2012 JiangSu Huahai Steel Structure Co.,Ltd
TEL:+86 516-83318552 FAX:+86 516 83967868 MOBILE PHONE:+86 13852483938 E-mail:johnjiang@hhssgroup.com info@hhssgroup.com