Tel:(+86) 516-85870709
Fax:(+86) 516-83967868
Phone:(+86)13852483938
E-mail:hhssgroup@163.com
Add:NO.1,Minjiang Road ,Industrial Park, Hi-Tech Industrial Development Zone,Xuzhou,Jiangsu Province,P.R,China
There is no need of pre-bagging for space frame design and fabrication because it is different from steel beams, which is continuous on the structure and space frame is connected by hinge rod. If the space frame is not designed and fabricated according to exact situation of design stage, it will produce times force. That is to say, the installation deviation will be the key factor for the space frame, which is sensitive for the overall stability. Moreover, as design of space frame is full stress optimization, it might be ultra-stress rods with arch so normally we will do like this. Although we can consider about the deviation during the procession, the deviation of the internal force analysis can not be ignored.
【Previous Item】:The ways of Eliminating liquefaction of foundation soil subs
【Next Item】:Where is space frame widly used?
Home | Recent Works | Products | Join Us | Contact Us
All copyrights reserved 2012 JiangSu Huahai Steel Structure Co.,Ltd
TEL:+86 516-83318552 FAX:+86 516 83967868 MOBILE PHONE:+86 13852483938 E-mail:johnjiang@hhssgroup.com info@hhssgroup.com