The correct lifting method of steel structure grid
更新时间:2021-02-08 09:29:15•点击:59859 • Grid Knowledge
During the construction of the steel structure grid, the method of hoisting is often used, and the steel plate is often deformed during the hoisting of the grid, causing unnecessary losses. The following will introduce the correct lifting method when hoisting the steel structure grid.
There are many methods for hoisting steel structure grids, including car crane hoisting, tower crane hoisting, hoist hoisting and manual hoisting. Tower crane and automobile crane installation can lift multiple pieces of steel at a time, but it cannot be used in high installation places, because this method cannot lift the steel to the exact installation place, so manual lifting must be added.For hoisting of a relatively high steel structure grid, it is necessary to use a hoist hoisting method, which can accurately lift the assembled components of the grid to the installation place and facilitate installation. At the same time, there is also a manual lifting method. This method is mainly used to set several steel wires on the steel structure grid. Other lifting methods are easy to damage the steel wires. Only manual lifting can protect the steel wires. But this kind of grid hoisting method is more dangerous, so in the whole steel structure grid hoisting method, it is not recommended to use manual lifting method.
-
Steel structure grid advantage
2021-03-11 16:10:29•186954 次
-
Force analysis of grid installation
2021-03-11 15:45:37•175488 次
-
Grid rod processing
2021-03-10 09:48:09•712699 次
-
Slurry jumping of three-dimensional rotary vibrating screen in grid structure
2021-03-09 11:23:53•510298 次